Skip to Content


THE EVOLUTION OF VENTOSTREAM


THE EVOLUTION OF VENTOSTREAM

FROM VISION TO ENERGY


The VentoStream AG, founded in 2023, originated from a family idea. For over 15 years, engineers Gebhard and Manuel Bernsau researched and developed the VentoStream wind turbine. The technology of the turbine is protected by already granted and pending patents.


Manuel Bernsau, CEO von Ventostream

The CEO of VentoStream AG is Manuel Bernsau
Mechanical Engineering Engineer / Postgraduate Studies in General Management


OUR MILESTONES
-15 YEARS VISION BECOMES REALITY

NOVEMBER 2026

The turbine is leaving the hall for the first time

Finally in its natural element: For the first time, the VentoStream turbine encounters real wind. This marks the beginning of the testing and validation phase, during which the technology is expected to demonstrate its performance and reliability under real conditions.

OCTOBER 2026

Pre-market version completed

Another important milestone has been reached: The pre-market version of the VentoStream turbine has been completed. After intensive development and manufacturing work, the company is one crucial step closer to entering the market.

MARCH 2026

Restart in Niederdorf

VentoStream is moving into a new, larger production hall in Niederdorf. With more space for development and manufacturing, as well as fresh motivation, the team is eagerly starting the next phase of the company's history.

FEBRUARY 2026

Major fire in Bubendorf

A major fire in the Bubendorf industrial area presents VentoStream with an unexpected challenge. The workshop and the warehouse have completely burned down, including finished turbine components. Fortunately, no one was harmed.

2026

Series production is 
about to launch

For the upcoming year, VentoStream plans its first small-scale production. Additionally, the product and service range will be expanded. This includes the development of system units and further versions of the turbine.

2025

Development and Manufacturing

In the year 2025, VentoStream is focusing on the development and construction of the beta version of its wind turbine.

Swiss Innovation Challenge
2024

3rd place at the Swiss Innovation Challenge

The Swiss Innovation Challenge innovation support program awards VentoStream third place. In the competition, our technology is recognized as a "wind turbine without side effects."

2023

Founding of 
VentoStream AG

After 13 years of research and development, the Bernsau family, along with two founding investors, establishes the company VentoStream.

2020

First fully functional prototype

To test the turbine in the wind, Gebhard Bernsau builds a flow-optimized wooden prototype on a small scale. Its functionality and structure are thoroughly examined in the wind tunnel, and initial measurement data is collected under different wind conditions. This data served as the basis for the later scaling of the wind turbine.

2016

Energy converter
receives first patent

Within six years, Gebhard Bernsau develops and builds the first fully functional energy converter machine and patents it. Unlike traditional wind turbines, the VentoStream turbine contains an energy converter. This optimizes and accelerates the conversion of wind into energy.

2010

Visionary Gebhard Bernsau driven by the spirit of invention

The passionate mechanical engineer Gebhard Bernsau recognized the problems of conventional wind turbines. Within him, the idea for a completely new method of wind energy generation is maturing. One that is not only energy-efficient but also operates quietly and without casting shadows or causing bird strikes.